Skip to main content
All remodel services
Loma Linda, CA · Remodel

Your Loma Linda pool, revived.

Resurfacing, re-tiling, equipment upgrades, and full redesigns for Loma Linda pools. Most projects done in 2–4 weeks.

Loma Linda, Freshly remodeled swimming pool in a mature Southern California backyard with established trees

If your Loma Linda pool is 15+ years old, chances are the plaster’s rough, the tile’s chipping, or the equipment’s started making noise it didn’t used to. None of that means you need a new pool. A well-scoped remodel gets it feeling new again, without the cost or disruption of a full tear-out.

Remodel scopes

What gets remodeled in Loma Linda.

Pick one scope or bundle several. Bundling usually saves on mobilization and drain-down charges.

01

Refinish / replaster

Strip old plaster, repair shell, resurface with pebble, quartz, or classic plaster. 5–10 day scope. $10k–$22k typical.

02

Waterline tile replacement

Pop chipped or dated tile, clean the bond beam, install new in glass mosaic, ceramic, or natural stone.

03

Coping replacement

Swap cracked or outdated coping for travertine, bullnose tile, cantilevered concrete, or natural stone.

04

Deck remodel

Tear-out and replace concrete, pavers, travertine, or tile. Deck-drain and expansion-joint work coordinated.

05

Equipment upgrade

Variable-speed pump, modern filter, automation, LED lighting, heat pump or gas heater. Usually pays for itself in electricity savings.

06

Saltwater conversion

Remove or bypass the chlorinator, add a salt cell. Easier maintenance, softer water, better for your skin.

07

Leak detection & shell repair

Pressure testing, dye testing, cracked-shell repair. We diagnose before we propose.

08

Full gut remodel

New shape, new depth contours, new features. Sometimes the shell is still sound, and rebuilding everything on top of it makes more sense than starting over.

Local conditions

Loma Linda pool considerations.

We engineer every Loma Linda pool shell to the lot's actual conditions. Most of the city runs valley-floor alluvial. Generally predictable. University-area lots near the foothills run more variable.

Remodel permits

Remodel permits in Loma Linda.

Cosmetic work (replaster, tile, coping) usually needs no permit; gas, electrical, and any shell or plumbing change does. How approvals run here:

The City of Loma Linda handles pool permits through building services. Review is generally straightforward.

Where we remodel in Loma Linda

University area

Neighborhoods near Loma Linda University. Lap pools and therapy spas are common requests here.

South Loma Linda

Established residential with moderate lot sizes.

North Loma Linda

Mixed residential with older and newer properties.

What to expect

What to expect from a remodel in Loma Linda.

  • Scope proposed around what actually needs work
  • Itemized pricing, no vague package remodels
  • Lifetime structural warranty on shell repairs
  • 3-year Pentair on the equipment set, 1-year California contractor warranty on workmanship
  • Most remodels ballparked within a day of seeing photos
  • No payment ahead of work completed
New construction instead?

Looking to build a brand new pool in Loma Linda rather than remodel? See Loma Linda new construction.

Common pools in Loma Linda
Features popular in Loma Linda
Frequently asked

Loma Linda pool remodel, frequently asked.

How much does a pool remodel cost in Loma Linda?

Pool remodel pricing in Loma Linda varies by scope. The actual quote is itemized, written after we walk the property and see what the existing shell, equipment pad, and hardscape are working with. Our ballpark estimator gives you a working range to start from.

How long does a pool remodel take in Loma Linda?

Most Loma Linda remodels take 2 to 4 weeks depending on scope. A refinish/replaster is 5–10 days. Add tile and coping and you're at 10–14 days. A full gut remodel runs 4–8 weeks. We give you a milestone schedule at signing.

Do I need a permit for a pool remodel in Loma Linda?

Cosmetic work (replaster, tile, coping) generally does not require a permit in Loma Linda. Equipment changes usually do if you're modifying gas lines or electrical. Any change that alters the pool shell, depth, or plumbing layout requires a permit. We handle any required submittals in our name.

Can you remodel a pool that's 20+ years old in Loma Linda?

Yes. Most Loma Linda pools we remodel are 15–35 years old. At that age, the shell is almost always still structurally sound. What wears out is the plaster surface, the tile, the coping, and the equipment. A remodel makes a 20-year-old pool look and run like new for a fraction of the cost of replacing it.

Should I remodel or replace my pool in Loma Linda?

If the shell is sound (no major structural cracks or chronic leaks), remodel. The shell was built to last 50+ years and resurfacing every 10–15 years is normal pool ownership. Replace only if the shell has repeated structural failures, the pool is in the wrong place for how you use the yard, or you want a fundamentally different size and shape.

Do you handle equipment upgrades as part of a remodel in Loma Linda?

Yes. We install Pentair variable-speed pumps, modern cartridge or DE filters, IntelliBrite color-change LED lighting, IntelliCenter automation, and IntelliChlor salt systems. Standardizing on the Pentair platform keeps integration clean and warranty paths simple. Equipment upgrades can run as a standalone job (no drain-down required) or bundled into a larger remodel to save on mobilization.

The payoff

Same pool. Feels brand new.

Send us a few photos.

Send a few photos and we can usually give you a same-day ballpark and scope recommendation.

Start my remodel
Talk to an owner